Gary wanted to have a walk-in shower, but retain the bath which limited us with space. We removed a wall, and reinstated it and installed underfloor heating. At the last minute, our client wanted a design change to use glass blocks, so we sourced them, installed and finished this project still in time. We fully tiled the bathroom walls and flooring



